Case Studies

ScrewFast have been providing fast, reliable screw pile and steel based foundations on highways and road since 2005, reducing the project duration by up to 70%.

Ross-on-Wye Substation
Read Case Study

Working for client Western Power, ScrewFast carried out the installation of 45 No. Helical Piles...

Elton Footbridge
Read Case Study

ScrewFast’s site team were on site this week and completed the installation of 8 helical...

Canterbury to Richborough Overhead Lines
Read Case Study

ScrewFast were approached by a Murphy Group and Eltel joint venture to design and install...

North Sea Observatory
Read Case Study

Award-winning construction company Gelder Group recruited ScrewFast to design and install foundations to support the...

Morrison Utility Services – Substations Projects
Read Case Study

As part of ScrewFast Foundations long-standing relationship with Morrisons Utilities, we were contracted to install...

M6 Motorway Junctions 2-4
Read Case Study

ScrewFast Foundations were contracted by McCann Ltd to design and install foundations for new Fixed...

Royal Free Hospital, Hampstead, London
Read Case Study

ScrewFast were chosen by main contractors Logan Construction to design, build and install the foundations...

Chestnut Farm Mobile Dwelling
Read Case Study

ScrewFast Foundations were approached by contemporary architects PAD Studio to design foundations for a series...

East Tilbury Telecommunications Tower Foundations
Read Case Study

ScrewFast Foundations were contracted by Galliford Try Communications to design and install foundations for a...

Chilling King Post Retaining Wall – Environmental
Read Case Study

80 Galvanised Posts to 8m installed within 4 days @ 1.5m spacings. 6.5m post embedment,...

Tesco Stores IOW- Civil Engineering
Read Case Study

Dudley’s Construction wanted a cost effective more efficient foundation solution compared to the traditional method...

Leicester Big Screen- Civil Engineering
Read Case Study

ScrewFast were approached by the client to provide a foundation solution for a 9.5m high...

Henham Footbridge, Latitude Festival- Environmental
Read Case Study

The brief was to replace the existing floating bridge with a permanent structure. 12 helical...

Winster Sub – Energy
Read Case Study

13th October 2011 – 10.30am – ScrewFast Commercial Manager receives call from Siemens – Winster...

Thorpe Marsh- Energy
Read Case Study

Brief: Design and Install helical piles solution as a cost effective alternative to concrete. Solution:...

Clongriffen- rail
Read Case Study

Our brief was to design, supply and install 14 OHLE foundations and the 4 Anchors....