Case Studies

ScrewFast have been providing fast, reliable screw pile and steel based foundations on highways and road since 2005, reducing the project duration by up to 70%.

East Tilbury Telecommunications Tower Foundations
Read Case Study

ScrewFast Foundations were contracted by Galliford Try Communications to design and install foundations for a...

Chilling King Post Retaining Wall – Environmental
Read Case Study

80 Galvanised Posts to 8m installed within 4 days @ 1.5m spacings. 6.5m post embedment,...

Tesco Stores IOW- Civil Engineering
Read Case Study

Dudley’s Construction wanted a cost effective more efficient foundation solution compared to the traditional method...

Leicester Big Screen- Civil Engineering
Read Case Study

ScrewFast were approached by the client to provide a foundation solution for a 9.5m high...

Redcar- Environmental
Read Case Study

 Birse were awarded a £21M contract to reduce the flood risk to 1000 properties.  The...

Henham Footbridge, Latitude Festival- Environmental
Read Case Study

The brief was to replace the existing floating bridge with a permanent structure. 12 helical...

Winster Sub – Energy
Read Case Study

13th October 2011 – 10.30am – ScrewFast Commercial Manager receives call from Siemens – Winster...

Thorpe Marsh- Energy
Read Case Study

Brief: Design and Install helical piles solution as a cost effective alternative to concrete. Solution:...

Clongriffen- rail
Read Case Study

Our brief was to design, supply and install 14 OHLE foundations and the 4 Anchors....

Bletchley Remodeling – rail
Read Case Study

The client sought a solution to support 2 Twin Track Cantilever (TTC) Overhead Line Electrification(OLE)...

Redcar – Flood Defence Wall / Scheme
Read Case Study

The Environment Agency awarded a £21M contract to Birse Coastal, a Birse Civils company, to...