Case Studies

ScrewFast have been providing fast, reliable screw pile and steel based foundations on highways and road since 2005, reducing the project duration by up to 70%.

Clongriffen- rail
Read Case Study

Our brief was to design, supply and install 14 OHLE foundations and the 4 Anchors....

Bletchley Remodeling – rail
Read Case Study

The client sought a solution to support 2 Twin Track Cantilever (TTC) Overhead Line Electrification(OLE)...

Redcar – Flood Defence Wall / Scheme
Read Case Study

The Environment Agency awarded a £21M contract to Birse Coastal, a Birse Civils company, to...