- Birse were awarded a £21M contract to reduce the flood risk to
1000 properties. - The flood defences stretch for 2.7km reducing erosion &
flood risk for at least 50 years. - Installed section by section to reduce disruption to residents
and visitors, 132 helical piles were installed across 3 zones
in just 5 weeks; - Zone 1 = 59 piles @ 11.5m long; Zone 2 = 63 piles @ 10.5m long;
Zone 3 = 10 piles @ 9m long.
Project: Redcar- Environmental