Its Electrifying!

April 3, 2014 5:04 pm

Spie ENS have appointed ScrewFast to assist them in the delivery of the Kirkby Orrell project, on behalf of Electricity North West to design, supply and install a combination of helical piles and Grip piles for 41no. wooden transmission line foundations and associated anchor stays, on the Kirkby to Orrell line. Our works commenced on site at the end of March 2014 and are scheduled to be completed within a 9 week programme.

Foundations for the Olympics – Our Statistics

April 3, 2014 5:01 pm

Lee Valley – 12,000 seats, 1067 piles to 8m. (8.5 kilometres of tube installed, uninstalled and recycled) Eton Dorney – 500 seats, 61 piles Hadleigh Farm – 500 seats, 190 piles BMX – 2000 seats, 118 piles Water Polo Venue – The building housed the pool and 5000 seats. 405 piles to average of 8.5m (3.5 kilometres of tube installed, uninstalled and recycled) Note all sites were installed, uninstalled and recycled. We provided foundations for 20,000 temporary seats at the Olympics.

Design Smart Motorways

April 3, 2014 5:00 pm

ScrewFast Foundations were appointed by Costain, on behalf on the Highways Agency, to undertake the detailed design of 70 no. helical pile and Grip pile foundations for the M1 J28-31.  Structures encompassing MS4’s, MS3’s and Portal Gantries. The scope of works also includes the production of Approval in Principle, Departure From Standard and Geotechnical Design Report Addendum documentation.  The design work got underway In December 2013 and is scheduled to be completed by July 2014.

Design Magic

April 3, 2014 4:56 pm

Halcrow Hyder JV appoints ScrewFast to M1 J39-42 Design Smart Motorways, to complete the detailed design of helical pile and Grip pile foundations, for: MS4’s Superspan Gantries Secondary Cabinet Platforms ADS/DS Signs CCTV structures There are 86no. structures in total. The scope of works also includes the production of Approval in Principle, Departure From Standard and Geotechnical Design Report Addendum documentation.  The design work began in May 2013 and is scheduled to be completed and approved by May 2014.

Barking Substation

April 3, 2014 3:41 pm

ScrewFast have successfully completed the design, supply and installation of helical piles and steel grillages at Barking 400kV Substation, supporting numerous structures throughout the site.  The works were completed in 2 phases spanning 2012-2014. Comparisons where taken between the use of steel and concrete, considering the whole life and direct project benefits.  Helical piles demonstrated significant gains in Value for Money, Installation and Performance. During the works, tests were performed to investigate the effects of stray current and the steel pile and grillage acting as sacrificial member. Following some collaborative design innovation with our client (SEESA) the tests conclusively removed any doubt of the possibility of stray current. The SEESA Team at Barking Substation recently collected the SEESA Project of...

Barking Substation

April 3, 2014 3:41 pm

ScrewFast have successfully completed the design, supply and installation of helical piles and steel grillages at Barking 400kV Substation, supporting numerous structures throughout the site.  The works were completed in 2 phases spanning 2012-2014. Comparisons where taken between the use of steel and concrete, considering the whole life and direct project benefits.  Helical piles demonstrated significant gains in Value for Money, Installation and Performance. During the works, tests were performed to investigate the effects of stray current and the steel pile and grillage acting as sacrificial member. Following some collaborative design innovation with our client (SEESA) the tests conclusively removed any doubt of the possibility of stray current. The SEESA Team at Barking Substation recently collected the SEESA Project of...